Nearly a year after the second crash of a Boeing 737 Max, and within a few months, a Committee of inquiry of the U.S. has charged Congress serious charges against the aircraft manufacturers and the Air traffic control FAA.
The Review of the 737 Max was “grossly insufficient”, – stated in the preliminary investigation report of the Committee on Friday. The FAA had not fulfilled its obligation in the detection of critical security issues in the framework of the certification of the aircraft.
“culture of Verheimlichens”
The criticism of the manufacturer Boeing is also fierce. The 737 Max has already been in their development due to technical errors and a lack of transparency towards supervisors and customers, “” be ruined, so the process crashes, the competent Committee of the US house of representatives. In addition, the preliminary investigation report Boeing accused of operation and technology of the aircraft and restrained veiled. The talk is of a “culture of Verheimlichens” in the group.
A spokesman for Boeing said on request only, to have comprehensively with the investigation, is cooperating, and want to check the results. The FAA said in a Statement to welcome the findings of the Congress Committee on transportation and infrastructure. The authority stressed that the aviation safety in the United States is high overall. The FAA faced the results and recommendations of the Committee, however, open to and wanted to learn it, in order to increase the safety of air travel in the world.
Boeing has errors and breakdowns given to
Boeing crash after the two 737-Max on 29. October 2018, and at 10. March 2019, in which a total of 346 people died, with his back to the wall. The Airbus-rival is suspected, the ill-flyers in the competition rushed on to the market and to have the safety neglected.
Boeing denies this, but has admitted mistakes and mishaps. US authorities assess whether the admission of the for about a year in the world with being banned from occupied model number 737 Max everything with the right things, approached.
control program used in the centre of the investigation
In the centre of the investigation for the 737 Max advanced control program, MCAS, has played according to the investigation reports, a critical role in the crash is. Boeing had already promised after the disaster in Indonesia, to fix the MCAS problems via Software Update.
a Little later it came to a crash in Ethiopia. The Update still has no approval of the FAA. If and when the 737 Max is allowed to lift it again, remains unclear. Boeing most recently expected so that the flyer be approved in mid-2020. These are the consequences, if you are in the morning water on an empty stomach, drink, FOCUS Online/Wochit these are the consequences, if you are in the morning on an empty stomach drink
rob/dpa/ AFP